{"id":47878,"date":"2025-10-07T21:32:18","date_gmt":"2025-10-07T16:32:18","guid":{"rendered":"https:\/\/baldiyattimes.com\/?p=47878"},"modified":"2025-10-07T21:32:18","modified_gmt":"2025-10-07T16:32:18","slug":"on-the-direction-of-cm-punjabroshan-lahore-mission","status":"publish","type":"post","link":"https:\/\/baldiyattimes.com\/?p=47878","title":{"rendered":"On the direction of CM Punjab\u201cRoshan Lahore Mission\u201d"},"content":{"rendered":"<p>In the first phase,Commissioner Lahore Marryam Khan visited n reveiwed restoration of the streets lights from Thokar to Dharmapura canal road,both sided.1337 road lights have been restored completely on both sides of the 35 Km area from Thokar to Dharmapura canal road .A total of 1439 road lights have been installed in this area. Due to LESCO work, 102 will be lit in next 24 hour. <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-47879\" src=\"https:\/\/baldiyattimes.com\/wp-content\/uploads\/2025\/10\/FB_IMG_1759854062257.jpg\" alt=\"\" width=\"1024\" height=\"682\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-47880\" src=\"https:\/\/baldiyattimes.com\/wp-content\/uploads\/2025\/10\/FB_IMG_1759854065287.jpg\" alt=\"\" width=\"1024\" height=\"682\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-47881\" src=\"https:\/\/baldiyattimes.com\/wp-content\/uploads\/2025\/10\/FB_IMG_1759854068027.jpg\" alt=\"\" width=\"1024\" height=\"682\" \/><\/p>\n<p>\u201c first phase must be completed with round-the-clock work. MCL must be active in the field. Clean and Roshan Lahore is the right of citizens.The top priorities of the Chief Minister of Punjab include Roshan Lahore and clean Lahore. There is no compromise on this\u201d:Commissioner Lahore Marryam Khan<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the first phase,Commissioner Lahore Marryam Khan visited n reveiwed restoration of the streets lights from Thokar to Dharmapura canal road,both sided.1337 road lights have been restored completely on both sides of the 35 Km area from Thokar to Dharmapura canal road .A total of 1439 road lights have been installed in this area. Due &hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[39],"tags":[],"class_list":["post-47878","post","type-post","status-publish","format-standard","hentry","category-39"],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/baldiyattimes.com\/index.php?rest_route=\/wp\/v2\/posts\/47878","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/baldiyattimes.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/baldiyattimes.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/baldiyattimes.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/baldiyattimes.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=47878"}],"version-history":[{"count":1,"href":"https:\/\/baldiyattimes.com\/index.php?rest_route=\/wp\/v2\/posts\/47878\/revisions"}],"predecessor-version":[{"id":47882,"href":"https:\/\/baldiyattimes.com\/index.php?rest_route=\/wp\/v2\/posts\/47878\/revisions\/47882"}],"wp:attachment":[{"href":"https:\/\/baldiyattimes.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=47878"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/baldiyattimes.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=47878"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/baldiyattimes.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=47878"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}